After 20+ years of pulling permits in every corner of Greater Seattle, we’ve seen it all: homeowners who skipped permits and faced forced wall demolitions before resale, contractors who didn’t know Seattle routes plumbing permits through a completely separate agency, and projects that got stuck for weeks because the wrong city’s portal was used. This guide gives you the straight facts on what requires a permit, what doesn’t, and exactly how the rules differ city by city in 2026.
What ALWAYS Requires a Permit in Greater Seattle
Every Greater Seattle city requires at least one permit the moment a bathroom remodel involves plumbing relocation, new electrical circuits, or structural modifications, no exceptions.
The specific permit types vary by city, but the triggers are consistent across all nine Greater Seattle jurisdictions:
| Work Type | Permit Required? | Permit Type |
|---|---|---|
| Moving a toilet to a new location | Yes | Plumbing |
| Relocating a sink | Yes | Plumbing |
| Moving or adding a shower | Yes | Plumbing + Building |
| Adding a new bathroom | Yes | Building + Plumbing + Electrical |
| Converting a half bath to full | Yes | Plumbing + Electrical |
| Adding/moving electrical outlets | Yes | Electrical |
| Installing or rewiring an exhaust fan | Yes | Electrical |
| Adding in-floor radiant heat | Yes | Electrical/Mechanical |
| Removing or adding walls (structural) | Yes | Building |
| New recessed lighting | Yes | Electrical |
| New shower pan with drain relocation | Yes | Plumbing |
| Adding a second showerhead | Yes | Plumbing |
| Replacing water heater | Yes | Mechanical/Plumbing |
| Any work on pre-1978 home disturbing >6 sq ft of paint | Yes | EPA RRP certification |
What Does NOT Require a Permit (Cosmetic Exemptions)
Painting, retiling in the same location, and swapping an old fixture for an identical new fixture in the same spot are exempt from permits in nearly every Greater Seattle city.
This is where homeowners have the most confusion. The good news: genuinely cosmetic updates don’t require permits. The important caveat: the moment you touch plumbing, electrical, or structure, you need at least one permit regardless of how “minor” the work feels.
| Work Type | Permit Required? |
|---|---|
| Painting walls and ceilings | ❌ No |
| Wallpaper | ❌ No |
| Replacing floor tile in same location | ❌ No |
| Replacing wall tile (no plumbing change) | ❌ No |
| Replacing a vanity top (same plumbing location) | ❌ No |
| Replacing a toilet with a new toilet in the same spot | ❌ No (most cities) |
| Replacing a faucet or showerhead in same location | ❌ No |
| Replacing mirrors, towel bars, accessories | ❌ No |
| Refinishing or reglazing a bathtub | ❌ No |
| Replacing flooring (vinyl, carpet, LVP — non-structural) | ❌ No |
| Replacing a vanity cabinet (same location, no plumbing change) | ❌ No |
Seattle — The Two-Agency System You Need to Know
Seattle is the only city in Greater Seattle that splits permit authority between two separate agencies, building and electrical through SDCI, plumbing through PHSKC, and contractors who don’t know this routinely face project delays.
This is the single most important Seattle-specific fact that most permit guides get wrong or skip entirely. Here’s how it works:
Seattle’s Two Permit Agencies
| Agency | What They Permit | Phone | Portal |
|---|---|---|---|
| SDCI (Seattle Dept. of Construction and Inspections) | Building, electrical, mechanical | (206) 684-8600 | services.seattle.gov/Portal |
| PHSKC (Public Health – Seattle & King County) | Plumbing only | (206) 263-9566 | Separate PHSKC application |
For a full bathroom remodel in Seattle, moving a toilet, adding a shower, rewiring for a new exhaust fan, you will file with both agencies. Budget for it upfront.
What Triggers an SDCI Building Permit in Seattle
- Adding or removing walls (any structural change)
- Changing window or skylight size or location
- Converting a space to add a bathroom where none existed
- Any structural modification related to the remodel
What Triggers an SDCI Electrical Permit in Seattle
- Adding new circuits or moving existing circuits
- Installing a new exhaust fan (wired)
- Adding outlets or changing outlet locations
- Adding recessed or vanity lighting circuits
Seattle’s $6,000 Cosmetic Threshold
Seattle has a unique exemption not found in any other Greater Seattle city: work valued under $6,000 in a six-month period for purely cosmetic updates is exempt from building permits. This covers painting, wallpapering, replacing cabinets in the same location, and retiling, as long as no plumbing or electrical work is involved.
What Triggers a PHSKC Plumbing Permit in Seattle
- Adding new supply or drain lines
- Replacing or relocating a water heater
- Installing a new shower pan with a relocated drain
- Any new fixture connection to existing plumbing
Seattle Permit Fees (2025–2026)
| Permit Type | Typical Fee |
|---|---|
| SDCI Building permit | ~1.5–2% of project valuation |
| SDCI Electrical permit | $200–$400 (typical bathroom scope) |
| SDCI Mechanical permit | $200–$300 |
| PHSKC Plumbing permit | $200–$350 |
| Technology surcharge | Added to all permit fees |
| Total typical bathroom remodel | $600–$1,200+ in permits alone |
| Permit Processing Times | Timeline |
|---|---|
| STFI (Subject to Field Inspection) — simple projects | 1–2 business days |
| Standard residential remodel | 2–3 weeks |
| Complex or structural changes | 6–8 weeks |
| PHSKC plumbing (separate process) | 1–2 weeks |
Renton Bathroom Permit Requirements (2026)
In Renton, all bathroom remodel permits, building, electrical, mechanical, and plumbing, are handled through a single agency, the Community & Economic Development Department, and most trade permits can be issued same-day online.
This is a major advantage over Seattle. One phone call, one portal, one department.
What Requires a Permit in Renton
- Plumbing changes (relocating or adding fixtures)
- Electrical changes (new circuits, outlets, exhaust fans)
- Structural changes (walls, beams, headers)
- Window or door size or location changes
- All work must meet Washington State Energy Code (WSEC-R)
Renton-Specific Rules to Know
Asbestos survey: Renton’s permit application submittal checklist explicitly requires confirmation that an asbestos survey has been completed per Puget Sound Clean Air Agency and WA L&I requirements before any renovation or demolition. This is stated directly on their Residential Interior Remodels page, more explicit than most cities.
Septic systems: If your Renton property is on a private septic system and you’re adding a bath or bedroom, you must obtain King County Environmental Health approval before you can apply for your building permit. The approval letter must be included with the permit submittal. Contact King County Environmental Health for the on-site sewage system permit process.
Renton Permit Application Process
| Step | Action |
|---|---|
| 1 | Email project name, address, and scope to permittech@rentonwa.gov |
| 2 | Receive secure FTP link to upload plans and documents |
| 3 | Allow 5 business days for initial completeness review |
| 4 | Pay fees upon acceptance notification |
| Permit Type | Timeline |
|---|---|
| Over-the-counter (electrical, plumbing, mechanical) | Same day — online portal |
| Residential building permit — first review | 2–3 weeks |
| Revisions to submitted plans | 1–2 weeks |
Phone: 425-430-7215
Email: permittech@rentonwa.gov
Portal: permitting.rentonwa.gov
In-person: 1055 S. Grady Way, Renton WA 98057 (Mon/Wed/Thu, 9–11:30am and 1–4pm)
Virtual appointments: Available Mon–Fri by appointment
Tukwila Bathroom Permit Requirements (2026)
Tukwila offers the most cost-effective permit path in Greater Seattle, a Minor Residential Remodel permit covers projects up to $20,000 for a flat fee of just $100 plus a 5% technology surcharge, making it the most affordable all-in permit track in the region.
What Requires a Permit in Tukwila
Same triggers as every other Greater Seattle city: plumbing relocation, new electrical circuits, structural changes, and mechanical modifications all require permits. Tukwila handles all permits through its Permit Center (Department of Community Development) and uses MyBuildingPermit.com for applications.
Tukwila’s Minor Residential Remodel Fast-Track
Projects valued at $20,000 or less, covering building, mechanical, electrical, and plumbing combined within one year, qualify for a single flat-fee permit:
$100 + 5% technology fee = $105 total
This is exceptional value. A comparable project in Redmond could cost $1,000–$1,500+ in permits alone.
Tukwila 2025 Official Building Permit Fee Schedule
(Per Resolution 2105, effective January 1, 2025)
| Project Valuation | Building Permit Fee |
|---|---|
| $1 – $500 | $75.64 + 5% tech fee |
| $501 – $2,000 | $75.64 + $5.00 per each $100 over $500 |
| $2,001 – $25,000 | $150.71 + $22.80 per each $1,000 over $2,000 |
| $25,001 – $50,000 | $698.72 + $17.81 per each $1,000 over $25,000 |
| Item | Tukwila 2025 Plumbing Permit Fees (Per Fixture) |
|---|---|
| Permit issuance (base fee) | $37.81 + tech fee |
| First fixture (sink, toilet, tub, shower) | $75.64 + tech fee |
| Each additional fixture | $17.10 + tech fee |
| Water heater | $17.10 + tech fee |
| Drain or vent pipe alteration (per fixture) | $17.10 + tech fee |
| Work Scope | Electrical Permit Fee |
|---|---|
| Added/altered circuits — up to 5 circuits | $68.46 + tech fee |
| Each circuit over 5 | +$11.41 per circuit (max $112.97) |
| Service change only (no new circuits) | $136.91 + tech fee |
Permit Center: tukwilawa.gov/departments/permit-center/
Portal: MyBuildingPermit.com
Address: 6200 Southcenter Blvd, Tukwila WA 98188
Bellevue, Kirkland, Redmond & Sammamish Permit Requirements
Bellevue
In Bellevue, replacing a toilet or sink in the exact same location does not require a permit, but installing a new shower always does, even if it stays in the same footprint.
Bellevue’s Development Services has the most explicit published rules of any Greater Seattle city. Here’s the exact framework from bellevuewa.gov:
Bellevue Bathroom & Kitchen Fixtures (official):
- NEW fixture installation → plumbing permit required
- Moving existing fixture → plumbing permit required (modifies water lines, drains, or vents)
- Replacing same fixture in same location → NO permit required (toilet, sink, bidet, laundry tub)
- Showers and bathtubs → permit required, always (stated explicitly)
Bellevue interior remodel rule: Any project that changes the interior without disturbing structural elements, creating new walls, converting a basement, adding a bathroom, requires a permit with plan review.
Bellevue emergency work provision: If a true emergency arises (loss of heat, water, or shelter), work may begin immediately without a permit. A permit must be obtained on the first City work day after the emergency work began. Common examples: failed water heater, burst pipe.
Bellevue Contacts:
- Phone: 425-452-4898
- Email: permits@bellevuewa.gov
- Fee estimator: permitfeeestimator.bellevuewa.gov
- Portal: MyBuildingPermit.com
- In-person hours: Mon–Thu, 10am–3pm
Kirkland
Kirkland’s Development Services Center follows the same statewide IRC triggers for permits. Fees are reviewed annually and adjusted per the Seattle Consumer Price Index for Wage Earners & Clerical Workers, meaning fees increase modestly each year.
Separate permits are required for building, mechanical, plumbing, electrical, and fire suppression (if applicable). All applications go through the Development Services Center at kirklandwa.gov.
Kirkland Contacts:
- Phone: 425-587-3600
- Portal: MyBuildingPermit.com
Redmond
Redmond adds a mandatory fire department review fee of $796.48 to every residential remodel permit, making it one of the most expensive permit jurisdictions in Greater Seattle and a cost that surprises nearly every homeowner who hasn’t budgeted for it.
This fire review fee applies to all residential remodel, addition, deck, and accessory structure permits. It is in addition to the building permit fee and plan review fee.
Redmond 2026 Building Permit Fees
(Official fee schedule, effective February 1, 2026)
| Project Valuation | Building Permit Fee |
|---|---|
| $0 – $500 | $46.89 |
| $501 – $2,000 | $46.89 + $6.08 per each $100 over $500 |
| $2,001 – $25,000 | $138.26 + $27.90 per each $1,000 over $2,000 |
| $25,001 – $50,000 | $781.12 + $20.17 per each $1,000 over $25,000 |
| $50,001 – $100,000 | $1,285.25 + $14.01 per each $1,000 over $50,000 |
Plan review: 65% of building permit fee (paid at submittal) Technology surcharge: 4% of total permit fees State Building Code fee: $6.50 per unit Fire review fee (all remodels): $796.48 flat Credit/debit card processing: 2.99%
Redmond penalty for unpermitted work:
- First infraction: double the permit fee
- Second+ infractions in same year: five times the permit fee
- May result in stop-work order or business license suspension
Redmond Contacts:
- Phone: 425-556-2473
- Email: permits@redmond.gov
- Portal: MyBuildingPermit.com
Sammamish
Sammamish follows all standard statewide IRC permit triggers. As a city incorporated in 1999, Sammamish is largely post-1990 construction, meaning lead paint and asbestos concerns are lower than in older Seattle, Renton, or Tukwila neighborhoods, though a pre-renovation survey is still best practice.
Sammamish Contacts:
- Website: sammamish.us/government/community-development/permit-center
- Portal: MyBuildingPermit.com

Kent & Federal Way Bathroom Permit Requirements
Kent
Kent requires permits for all plumbing and mechanical alterations, which covers the scope of any real bathroom remodel. Applications go through the Permit Center (Economic & Community Development) at kentwa.gov, with most applications submitted via MyBuildingPermit.com.
Kent Contacts:
- Phone: 253-856-5302
- Portal: MyBuildingPermit.com
- Website: kentwa.gov/pay-and-apply/apply-for-a-permit
Federal Way
Federal Way explicitly lists “painting, papering, tiling, carpeting, cabinets, countertops and similar finish work” as permit-exempt under IRC Section R105.2, one of the clearest cosmetic exemption statements of any city in Greater Seattle.
Federal Way’s published exemption list (from their official Residential Permit Exemptions page) goes further than most cities and specifically addresses plumbing:
Federal Way plumbing exemptions (no permit needed):
- Stopping leaks in drains, water, soil, waste, or vent pipes (minor repair, nothing concealed)
- Clearing stoppages or repairing leaks in accessible pipes, valves, or fixtures
- Removal and reinstallation of a toilet, IF no rearrangement of valves, pipes, or fixtures is required
Federal Way plumbing requiring a permit:
- Any new fixture installation
- Any relocation of plumbing
- Any replacement or rearrangement of valves, pipes, or fixtures behind walls
Federal Way Contacts:
- Phone: 253-835-2607
- Address: 33325 8th Ave S, Federal Way WA 98003
- Hours: Mon, Tue, Thu, Fri, 9am–4pm (closed Wednesdays)
- Portal: MyBuildingPermit.com
Greater Seattle City-by-City Permit Comparison
| City | Permit Agency | Same-Day OTC? | Standard Review | Unique Rule | Penalty |
|---|---|---|---|---|---|
| Seattle | SDCI + PHSKC (split) | Yes (STFI track) | 2–3 weeks | Two separate agencies; $6K cosmetic threshold | Up to $500/day + double fees |
| Renton | CED (single) | Yes (online) | 2–3 weeks | Septic pre-approval required; asbestos explicitly noted | Double fees |
| Tukwila | DCD (single) | Via portal | Standard | $100 flat Minor Remodel permit for ≤$20K projects | 100% investigation fee |
| Bellevue | Dev. Services (single) | Yes | 2–4 weeks | Emergency work exemption; same-location swap exempt | Double fees |
| Kirkland | DSC (single) | Via portal | 2–3 weeks | CPI-adjusted annual fee increases | Double fees |
| Redmond | Dev. Services (single) | Via portal | 2–3 weeks | $796.48 mandatory fire review fee on all remodels | 2–5x fees |
| Sammamish | Comm. Dev. (single) | Via portal | Standard | Mostly post-1990 housing stock | Double fees |
| Kent | Permit Ctr. (single) | Via portal | Standard | Standard IRC application | Double fees |
| Federal Way | Comm. Dev. (single) | Via portal | Standard | Most explicit cosmetic exemption list in region | Double fees |
Washington State Building Code — What Your Bathroom Must Meet
Regardless of which Greater Seattle city you’re in, any permitted bathroom remodel must comply with Washington’s 2021 International Residential Code (IRC), including mandatory exhaust ventilation, low-flow fixtures, GFCI electrical protection, and, for structural work, seismic bracing per ASCE 7.
Washington adopted the 2021 IRC statewide in 2023. These are minimums. All Greater Seattle cities adopt these standards and may add local amendments.
Exhaust Ventilation (WAC 51-52 / IRC M1505)
Bathrooms without an operable exterior window must have a mechanical exhaust fan. Requirements:
| Spec | Requirement |
|---|---|
| Minimum CFM (continuous operation) | 50 CFM |
| Minimum CFM (intermittent/on-switch) | 110 CFM |
| Duct destination | Directly to exterior only (not into attic or crawl space) |
| Minimum duct diameter | 4 inches (3-inch ducts must be upsized) |
| Code trigger | If ceiling is opened during remodel, fan must be upgraded |
| Fixture | Maximum Flow Rate (WA WAC 51-56) |
|---|---|
| Toilet | 1.28 GPF (gallons per flush) |
| Showerhead | 1.75 GPM (gallons per minute) |
| Bathroom faucet | 1.2 GPM |
| Kitchen faucet | 1.8 GPM |
| Requirement | Rule (NEC via WA L&I) |
|---|---|
| GFCI protection | Required within 6 feet of any water source |
| AFCI protection | Required in bathrooms (updated 2023) |
| Lighting | LED required for new or replaced bathroom lighting fixtures (WSEC compliance) |
Lead Paint & Asbestos Rules for Pre-1978 Homes
In homes built before 1978, any bathroom remodel that disturbs more than 6 square feet of painted surface requires an EPA RRP certified contractor, a federal rule that applies in every city in Greater Seattle without exception.
Greater Seattle has significant housing stock built before 1978. If your home falls into this category, the following rules apply before demo begins.
EPA Renovation, Repair & Painting (RRP) Rule
Federal rule: 40 CFR Part 745
| Trigger | Requirement |
|---|---|
| Home built before 1978 | Pre-renovation lead disclosure required |
| Disturbing >6 sq ft interior painted surface | EPA RRP Certified Firm required |
| Disturbing >20 sq ft exterior painted surface | EPA RRP Certified Firm required |
Washington State administers its own authorized RRP program through the WA Department of Commerce. Firm certification costs $25. Individual renovator certification requires a WA State-accredited training course.
Note: Northwest Builders & Renovation is EPA RRP certified. All pre-1978 projects are tested for lead paint and documented for compliance on permitted remodels.
| Material | Common in |
|---|---|
| Floor tile and mastic adhesive | Pre-1980 homes |
| Ceiling texture (“popcorn”) | Pre-1978 homes |
| Pipe insulation | Pre-1970 homes |
| Joint compound / drywall mud | Pre-1978 homes |
| Vinyl sheet flooring backing | Pre-1980 homes |
Renton’s permit checklist requires asbestos survey confirmation, but PSCAA and WA L&I rules apply across all Greater Seattle jurisdictions.
What Happens If You Skip the Permit?
Unpermitted bathroom work in Greater Seattle can result in daily fines up to $500, forced demolition for inspection, and serious legal complications when you sell your home under Washington State’s mandatory disclosure laws.
This isn’t theoretical. Our team has assessed dozens of homes over the years where unpermitted bathroom work created real problems for the owners. Here’s what’s at stake:
| Consequence | Detail |
|---|---|
| Daily fines | Up to $500/day in Seattle; double to quintuple fees in most other cities |
| Stop-work orders | All construction halted immediately; work cannot resume until permit is issued |
| Forced demolition | Inspector can require walls, floors, or ceilings to be opened for retroactive inspection |
| Resale disclosure (WA RCW 64.06) | Sellers must disclose known unpermitted work; buyers may demand remediation or walk |
| Insurance denial | Claims may be denied for damage caused by unpermitted work (plumbing leaks, electrical fires) |
| Refinancing problems | Lenders may reject appraisals with unpermitted improvements, blocking refinancing |
| Double/quintuple fees | Retroactive permits cost significantly more; some cities charge up to 5× for violations |
| Business license risk | Contractors risk losing WA L&I license for repeated unpermitted work |
Can You Pull Your Own Permit in Washington State?
Yes, homeowners in Washington State can act as owner-builders and pull their own building permits, but licensed contractors must pull their own trade permits for electrical and plumbing work in most jurisdictions.
Here’s how it works in practice:
Homeowner can pull: Building permit (structural/general construction work on your own primary residence)
Licensed contractor must pull: Electrical permit (only WA L&I licensed electricians can pull electrical permits in most cities), Plumbing permit (licensed plumbers pull their own permits in Seattle/PHSKC and most other jurisdictions)
Important nuance: In Seattle, plumbing permits are issued by PHSKC. The plumber on your job must be licensed with WA L&I AND familiar with PHSKC’s separate application process.
If you hire a general contractor like Northwest Builders & Renovation, we coordinate all permits across all trades. Homeowners who try to owner-build often don’t realize how much coordination is involved in a full bathroom remodel, particularly in Seattle where two separate agencies are involved.
How Northwest Builders & Renovation Handles Permits
At Northwest Builders & Renovation, permits aren’t an afterthought, they’re built into our project process from day one. Here’s our standard approach:
Before we break ground:
- Determine permit requirements for your specific city and scope
- Identify whether your home was built before 1978 (lead/asbestos protocol)
- Submit permit applications and account for review timelines in the project schedule
- Coordinate PHSKC plumbing permit separately for Seattle projects
During construction:
- All inspections scheduled and passed at each required phase
- Permit placard posted on-site as required
- No work covered until inspection is approved
At project completion:
- Final inspection passed and permit closed
- Copy of closed permit provided to homeowner for their records
- Closed permits are an asset at resale, they prove the work was done to code
We hold WA L&I License #NWBUIBR813NK9 and are EPA RRP certified. Our team has completed 1,000+ projects across Greater Seattle, Renton, and Tukwila since 2006. Every one of them was properly permitted.
Ready to start your bathroom remodel? Call us at (206) 350-6331 or visit northwestbnr.com for a free estimate.
Frequently Asked Questions
Do I need a permit to retile my bathroom in Seattle?
No, retiling walls and floors in the same location does not require a permit in Seattle, as long as no plumbing is relocated and the tile work stays within the $6,000 cosmetic threshold per six-month period. If you’re retiling a shower and replacing the pan with a new drain location, a plumbing permit through PHSKC is required.
Do I need a permit to move a toilet in Seattle?
Yes. Moving a toilet to a new location requires a plumbing permit through PHSKC (Public Health – Seattle & King County), not through SDCI. PHSKC can be reached at (206) 263-9566. Most contractors miss this and only file with SDCI.
How much does a bathroom permit cost in Seattle?
A typical full bathroom remodel in Seattle, involving plumbing relocation, new electrical circuits, and a building permit, will cost $600–$1,200 in total permit fees across SDCI and PHSKC. Projects with structural changes or complex scope can run higher.
How long does it take to get a bathroom permit in Renton?
Over-the-counter permits (electrical, plumbing, mechanical) can be issued the same day through Renton’s online portal at permitting.rentonwa.gov. A building permit for a full remodel typically takes 2–3 weeks for the first review decision.
What happens if I remodel a bathroom without a permit in Washington State?
Consequences include daily fines (up to $500/day in Seattle), double or quintuple permit fees paid retroactively, forced demolition for inspection access, mandatory disclosure to buyers at resale under RCW 64.06, and potential insurance claim denials. The financial and legal exposure far exceeds the cost of pulling the permit properly.
Can I replace a toilet without a permit in Greater Seattle?
In most Greater Seattle cities, including Bellevue and Federal Way, replacing a toilet with a new toilet in the same location does not require a permit. In Seattle, the same rule generally applies for same-location swaps under the cosmetic threshold. If the toilet is being moved to a new location, a plumbing permit is required in all jurisdictions.
Do I need a permit to add a bathroom in my Seattle home?
Yes. Adding a bathroom where none previously existed requires a building permit through SDCI, a plumbing permit through PHSKC, and an electrical permit through SDCI. Structural work for the new bathroom may require engineer-stamped plans. Budget 6–10 weeks for permit approvals.
Does a plumber pull their own permit in Seattle?
Yes. In Seattle, plumbing permits are issued by PHSKC (not SDCI), and a licensed plumber pulls the PHSKC plumbing permit for the work they’re performing. Your general contractor does not pull the plumbing permit, the licensed plumber does.
What is the cheapest permit option for a bathroom remodel in Greater Seattle?
Tukwila’s Minor Residential Remodel permit covers projects up to $20,000 (combining building, mechanical, electrical, and plumbing) for a flat fee of $100 plus a 5% technology fee, the most affordable all-in permit track in the region by a wide margin.
Do I need an asbestos test before remodeling my bathroom?
If your home was built before 1980, yes, both the Puget Sound Clean Air Agency and WA Department of Labor & Industries require a pre-renovation asbestos survey before demolition. Common locations include floor tile, ceiling texture, pipe insulation, and drywall joint compound. If asbestos-containing materials are found, a licensed abatement contractor is required.
Do I need a permit to replace a shower in Bellevue?
Yes. Bellevue explicitly states that showers and bathtubs always require a permit even for a replacement in the same location. A plumbing permit is required for any shower work. If you’re also adding electrical (exhaust fan, lighting), a separate electrical permit is required.
How do I apply for a bathroom permit in most Greater Seattle cities?
Seven of nine Greater Seattle cities Renton, Bellevue, Kirkland, Redmond, Sammamish, Kent, Federal Way, and Tukwila use the shared MyBuildingPermit.com portal. Create one account and apply across all these cities from a single platform. Seattle uses its own portal at services.seattle.gov/Portal, with plumbing going through PHSKC separately.