This City Was Built to House Veterans Fast Those Houses Are Still Small

Home Remodeling in Mountlake Terrace, WA

Mountlake Terrace was one of the region’s first large planned suburbs, laid out in the years after the Second World War to put returning veterans into affordable houses quickly. That origin is still the defining fact about this city’s housing. The ramblers that fill these streets were built small, built fast, and built to a repeated plan, which means most homeowners here are asking the same question in slightly different words, which is how to get more room out of a house that was never designed to have any. Northwest Builders & Renovation has worked these floor plans, and we know which directions they can actually grow.

Two Decades of Trusted Service

Four Ways to Add Space to a 1950s Rambler and Which One Fits

The first option is out. Extending into the back or side yard is usually the most straightforward structurally, and what limits it is setbacks, lot coverage, and on some parcels the wetland and stream buffers that run through this city. The second is up. Adding a second story to a 1950s rambler is possible and it is a bigger project than most homeowners expect, because the existing foundation and framing were sized for one floor and both have to be evaluated before anything goes on top. It also changes the house completely, which some owners want and some do not.

The third is down. Where a home has a basement or a partial daylight basement, finishing it is generally the cheapest square footage available, and in this city the governing question is groundwater and drainage. The fourth is separate, meaning an accessory dwelling unit, which works where the lot has depth and access. The right answer depends on the parcel, the budget, and whether you want more of the same house or a different house. We walk all four with you rather than quoting the one we would rather build.

Rooftop terrace with Japanese maples in concrete planters adding outdoor space in Mountlake Terrace WA

What Is Inside These Houses and What the Ground Is Doing

Mass-produced 1950s construction is consistent, which is useful, because the surprises are predictable. Original electrical service sized for a household with almost no appliances. Galvanized supply lines that have been closing up internally for seventy years. Little or no wall insulation. Single-pane glass. Low ceilings, bathrooms built to a minimum, and no primary suite in the original plan. Crawlspaces that were never properly ventilated or vapor sealed. Any project that opens a wall in one of these houses should include replacing what is inside it, and a bid that does not is a bid that will change.

The ground and the water add their own constraints. Hall Creek, McAleer Creek, and the Lake Ballinger drainage run through and alongside this city, and the Ballinger watershed has a long documented history of flooding problems. Where wetland or stream buffers apply, they govern where a footprint can sit regardless of setbacks. Projects adding impervious area run into stormwater requirements. Separately, with light rail now serving the city, Mountlake Terrace has rezoned substantially around the station area, which has changed what many nearby lots are permitted to hold.

What We Build

Every Service We Build in Mountlake Terrace

The original Mountlake Terrace kitchen is a small closed room behind a load-bearing wall, and the wiring and plumbing inside need replacing while it is open. Done properly it is the most transformative change available in these houses.

These homes came with one small bathroom and no primary suite. We make the existing bathroom genuinely usable and add a second where the plan allows, rebuilt from the framing out with walk-in conversions and full-height tile.

State law and the station area rezoning both expanded what is possible, and transit access makes a second unit valuable. Lot depth, buffers, stormwater, and access decide it. We name the workable path before design money is spent.

A covered outdoor room is one of the better value additions to a small rambler, adding usable space without conditioned square footage costs. Placement clears buffers where they apply. We build rated for wet season loading.

Original siding on this generation has managed Puget Sound moisture for seventy years, typically over no weather barrier at all. What is behind it is frequently the real project. We replace over full moisture barriers with correct flashing.

Where a home has basement or daylight space, finishing it is usually the cheapest way to add real living area, and in this city the deciding factor is water. We assess drainage first, handle egress, and finish legally.

The service this city needs most. A well-designed addition adds the primary suite or family space the original plan never had. We establish the envelope, engineer to the site, match the roofline, and manage permitting through approval.

Mountlake Terrace roofs deal with wet season exposure, moss, and heavy canopy debris, and on the era’s low-slope sections ventilation and detailing matter as much as the covering. We assess the whole assembly and report in writing.

These houses are strong whole-house candidates because everything is original at the same age. We sequence electrical, plumbing, insulation, and envelope first, then structure and layout, then finishes, so the house performs as well as it looks.

Our Work

Real Remodeling Projects in Mountlake Terrace

We Come to Mountlake Terrace Your Estimate Is Built on What We Find

On a house of this generation the estimate depends on the electrical service, the plumbing, the crawlspace, and the foundation, and none of that can be assessed from a phone call. We come out, look at all of it, check the buffers and current zoning on your parcel, and hand you a written estimate built on the findings, along with a straight opinion on which direction the house should grow. No surprises after signing. No change orders for conditions we should have identified during the estimate.

Years Experience
0 +
Projects Completed
0 +
Company Rating
0 *
Happy Clients
0 %

Common Questions

Mountlake Terrace Homeowners Ask

It depends on the parcel and on what you actually want. Adding out is usually the most straightforward structurally and is limited by setbacks, lot coverage, and any buffers on the property. Adding up is a larger project because the existing foundation and framing were sized for one floor and have to be evaluated first. Finishing a basement is typically the cheapest square footage where the space exists. An ADU works where the lot has depth and access. We walk all four during the estimate rather than steering you toward one.

Sometimes, and it requires evaluating the foundation and the existing framing before anything is designed, because neither was sized for a second floor. Where the structure will not carry it, reinforcement or foundation work becomes part of the project, and at that point the cost comparison against a ground-level addition changes. We assess it honestly rather than selling a second story that the house would need substantial structural work to support.

Any wall we open gets rewired, and if the existing service cannot carry the added load a service upgrade becomes part of the project. On houses of this generation the original service was sized for a household with almost no appliances, so a panel and service upgrade is common rather than exceptional. We map the existing system during the estimate and give you a phased plan instead of an all-or-nothing number.

These houses were built before crawlspace ventilation and vapor control were understood, so many still have inadequate ventilation and missing or failed vapor barrier. Add grading and downspouts that direct water toward the foundation and the space stays wet most of the year. It works continuously against framing, insulation, and flooring, and correcting it usually costs much less than the damage it produces.

For many parcels, yes. State ADU law expanded what cities must permit, and Mountlake Terrace rezoned substantially around its station area, which changed what nearby lots can hold. The limiting factors are lot depth, buffers, stormwater, and construction access. We check the current zoning for your specific parcel and give you a direct answer.

Yes. We manage the full process under WA L&I License #NWBUIBR813NK9, including plans, structural evaluation for second-story and addition work, critical areas review where creek and wetland buffers apply, stormwater engineering, submittals, corrections, and inspections.

These Houses Were Built for a Generation Starting Over Make Yours Work Now

Mountlake Terrace exists because a lot of families needed somewhere affordable to start after the war, and the houses did that job honestly. They are small, they are sound, and they respond very well to being opened up and added to. Northwest Builders & Renovation knows this housing generation and brings structural, systems, and permitting experience to making it fit the way people live now.

Office Hour

Monday – Sunday:
8 a.m. – 8 p.m.

sales@northwestbnr.com

🛡️ Our Guarantee

Get Started Today

Schedule Your Free Design Consultation

Tell us about your project and we’ll contact you within 24 hours to discuss your vision, budget, and timeline.

Contact Us Form